Measure in the order that protects the repair
Repair workflows
Choose the closest symptom or subsystem and follow a controlled sequence: power-off checks, first live measurements, block isolation and staged power-up.
Fast starting points
Open the route that best matches the evidence already available.
No power / no 24 V
Start with input safety, startup VCC and auxiliary rails.
Open workflow →02No PWM
Check controller supply, reference, timing, shutdown and outputs.
Open this route →03Before replacing IGBTs
Verify the driver, load path and power-stage resistance first.
Open this route →04Process sequence
Follow plasma, MIG or TIG command order.
Open this route →Power-off checks and controlled startup
Reduce the risk of another failure before applying full mains power.
PWM, feedback and gate-drive diagnosis
Move from the controller to the driver and gate without skipping protection signals.
MIG, TIG and plasma process workflows
Follow the command sequence when auxiliary power and the main inverter are already present.
Maintenance, tools and case comparison
Use repeatable records and known cases to verify a repair before returning the machine.